Media Summary: The Washington State Department of Transportation (WSDOT) is warning of long backups during the Road closures begin at 10 p.m. Friday, Aug. 18 until 5 a.m. Monday, Aug. 21. The Washington State Department of Transportation says the closures will begin at 6 p.m.
I 405 Closes For Weekend Work - Detailed Analysis & Overview
The Washington State Department of Transportation (WSDOT) is warning of long backups during the Road closures begin at 10 p.m. Friday, Aug. 18 until 5 a.m. Monday, Aug. 21. The Washington State Department of Transportation says the closures will begin at 6 p.m. Closures are planned for the interchange over the next four weeks as crew Drivers in the Bothell and Woodinville area should prepare for heavy traffic and long delays as the